There are two insulation jackets, for the main chamber and for the sample transfer mechanism.
The heat insulation jacket of the main chamber section is installed from the front side of the device, and fixed with Velcro on the back side and the top.
On the back side, the main chamber vacuum gauge sensor (IG) and the turbo molecular pump are mounted, so there is little clearance; perform the work carefully.