Overhaul
We offer maintenance and overhaul services for the instrument.
Please refer to the following table.
No.001 Pre-inspection
Implementation period |
Every year |
Standard working time |
4.0H |
Used / replacement parts |
Sample set for check |
Remarks |
Check the current status of instrument. |
No.002 IR lamp replacement
Implementation period |
Every year |
Standard working time |
0.5H |
Used / replacement parts |
IR lamp[1] |
Remarks |
Parts used differ depending on instrument specifications. |
No.003 Foreline trap element exchange
Implementation period |
Every year |
Standard working time |
0.5H |
Used / replacement parts |
element:20-H026-00-050[1can] |
Remarks |
Parts used differ depending on instrument specifications. |
No.004 Rotary pump oil change
Implementation period |
Every year |
Standard working time |
2.0H |
Used / replacement parts |
Rotary pump oil |
Remarks |
The used parts differ depending on instrument specifications and manufacturer. |
No.005 Sample stage replacement
Implementation period |
Every year |
Standard working time |
2.0H |
Used / replacement parts |
Quartz stage, thermocouple, ICF gasket |
Remarks |
Parts used differ depending on instrument specifications.
|
No.006 Cleaning in the heating chamber
Implementation period |
Every year |
Standard working time |
0.5H |
Used / replacement parts |
ICF gasket |
No.007 Cleaning the load lock chamber
Implementation period |
Every two years |
Standard working time |
3.0H |
Used / replacement parts |
ICF gasket |
No.008 Sample transfer mechanism leaf spring exchange
Implementation period |
Every two years |
Standard working time |
1.0H |
Used / replacement parts |
leaf spring, gasket |
No.009 IR introduction mechanism polishing
Implementation period |
Every two years (According to contamination) |
Standard working time |
1.0H |
Used / replacement parts |
gasket |
No.010 TMP(2)Bearing replacement
Implementation period |
Every 3 years |
Standard working time |
3.0H |
Used / replacement parts |
Bearing, gasket |
Remarks |
Parts used differ depending on instrument specifications. |
No.011 Oil mist filter replacement
Implementation period |
Every 4 years (According to contamination) |
Standard working time |
0.5H |
Used / replacement parts |
filter |
No.012 Gate valve replacement
Implementation period |
Every 4 years |
Standard working time |
4.0H |
Used / replacement parts |
Gate valve, gasket |
Remarks |
It depends on the frequency of use. |
No.013 Rotary pump replacement
Implementation period |
Every 5 years |
Standard working time |
2.0H |
Used / replacement parts |
Rotary pump, Anti-vibration rubber |
No.014 Adjustment of resolution and mass axis of QMS
Implementation period |
Every year |
Standard working time |
2.0H |
Used / replacement parts |
Standard gas for adjustment |
No.015 QMS ion source exchange
Implementation period |
Every two years (According to contamination) |
Standard working time |
2.0H |
Used / replacement parts |
Ion source, gasket |
No.016 Vacuum start up & Baking
Implementation period |
Every year |
Standard working time |
2.0H |
No.017 Performance check after overhaul
Implementation period |
Every year |
Standard working time |
5.0H |
Used / replacement parts |
Sample set for check |
Remarks |
Be sure to carry out when maintenance is performed. |
No.018 Hydrogen standard sample measurement
Implementation period |
Every year |
Standard working time |
1.0H |
Used / replacement parts |
Hydrogen standard sample |
Remarks |
Perform after baking for 1 day or more. |
No.019 Measurement for QMS characteristic correction
Implementation period |
Every year |
Standard working time |
3.0H |
Used / replacement parts |
Ne & Ar implant sample |
Remarks |
Perform after baking for 1 day or more. |